The Project has to be beginning with data collecting and providing. Based on these data, the technology provider is able to develope a “preliminary level” model that is needed to make decision - on the one hand - by the applicant if he wants to begin the project or not, and - on the other hand - by the financier, if he wants to finance the project or not.
Both decisions are needed to the begoinning of the successfull project development.
The following documents are provided:
- Basic Data Filling form of TCG modeling. (xlsx and pdf)
- Brief description of Proximate-, and Ultimate Analysis of the feed materials.
- Basic Technical and Financial Data Inputs to be used in modeling (.pdf)
- Basic Technical and Financial Data Inputs to be used in modeling (.xlsx)
- General, Step-by-step Procedure of TCG Projects (.pdf)
General Procedure
The development period of the TCG projects begins with the data collecting. This consists of the “surveying” of both the requirements and the ability of the partner.
What do these mean exactly:
- Data collecting.
We need all the significant and relevant data of the technical and financial environment. (“Basic Data Filling Form” must be filled in, signed and stamped.)
- Basic data of the feed material/MSW If you do not have “Proximate and Ultimate Analysis” report on the MSW and other feed materials, we can use the EU MSW parameters as basic data.
- There are needed the selling prices of both the end-product(s). (electric and the heat energy, liquide and gasous end product of liquefaction unit).
- We also need the exact position of the landfill site (coordinate(s)), and the closest point of the electricity grid which the electric energy can be connected to.
After having received these “Basic Data”, we can build up the Preliminary model and a preliminary business plan - free of charge (more exactly we cover the costs). These documents are requested by the financiers to make decision about their readyness to finance the projects.
- We have several partners who are ready to finance the TCG projects, depending upon the partner’s requirements and the abilities, and the political environments.